Контакты
с 8:00 до 22:00
без выходных
8 (812) 920-85-20
многоканальный
sales@bastion24.ru Заказать звонок

Как мы работаем

По сертификату
"военный регистр"
Только с Юр. Лицами,
мелкий и крупный опт
STGWA30HP65FB2 IGBT 650 V, 3-Pin TO-247 long leads
Цена по запросу

STGWA30HP65FB2 IGBT 650 V, 3-Pin TO-247 long leads

Semiconductors\Discrete Semiconductors\IGBTsThe STMicroelectronics trench gate field-stop, 650 V, 30 A, high-speed HB2 series IGBT in a TO-247 long leads package, has a positive VCE(sat) temperature coefficient.
Channel Type N
Maximum Collector Emitter Voltage 650 V
Maximum Gate Emitter Voltage ±30V
Maximum Power Dissipation 167 W
Number of Transistors 1
Package Type TO-247 long leads
Pin Count 3
Transistor Configuration Series
Base Product Number STGWA30 ->
Current - Collector (Ic) (Max) 50A
Current - Collector Pulsed (Icm) 90A
ECCN EAR99
Gate Charge 90nC
HTSUS 8541.29.0095
IGBT Type Trench Field Stop
Input Type Standard
Moisture Sensitivity Level (MSL) 1 (Unlimited)
Mounting Type Through Hole
Operating Temperature -55В°C ~ 175В°C (TJ)
Package Tube
Package / Case TO-247-3
Power - Max 167W
REACH Status REACH Unaffected
Reverse Recovery Time (trr) 140ns
RoHS Status ROHS3 Compliant
Series HB2 ->
Supplier Device Package TO-247 Long Leads
Td (on/off) @ 25В°C -/71ns
Test Condition 400V, 30A, 6.8Ohm, 15V
Vce(on) (Max) @ Vge, Ic 2.1V @ 15V, 30A
Voltage - Collector Emitter Breakdown (Max) 650V
Brand STMicroelectronics
Collector- Emitter Voltage VCEO Max 650 V
Collector-Emitter Saturation Voltage 1.65 V
Configuration Single
Continuous Collector Current at 25 C 50 A
Continuous Collector Current Ic Max 50 A
Factory Pack Quantity 600
Gate-Emitter Leakage Current 250 nA
Manufacturer STMicroelectronics
Maximum Gate Emitter Voltage -20 V, 20 V
Maximum Operating Temperature +175 C
Minimum Operating Temperature -55 C
Mounting Style Through Hole
Package/Case TO-247-3
Packaging Tube
Pd - Power Dissipation 167 W
Product Category IGBT Transistors
Product Type IGBT Transistors
Subcategory IGBTs
Technology Si

Дмитрий Тест

Хороший проц
Плюсы:
Да
Минусы:
Нет

Андрюшка

Нормуль
Плюсы:
Плюсы!

Заказать звонок

Заполните форму и мы перезвоним вам в течение 10 минут

Нажимая кнопку, я даю согласие на обработку персональных данных