Как мы работаем
По сертификату
"военный регистр"
"военный регистр"
Только с Юр. Лицами,
мелкий и крупный опт
мелкий и крупный опт

Цена по запросу
STGWA30HP65FB2 IGBT 650 V, 3-Pin TO-247 long leads
Semiconductors\Discrete Semiconductors\IGBTsIGBT Trench Field Stop 650V 50A 167W сквозное отверстие TO-247, длинные выводы
Base Product Number | STGWA30 -> |
Current - Collector (Ic) (Max) | 50A |
Current - Collector Pulsed (Icm) | 90A |
ECCN | EAR99 |
Gate Charge | 90nC |
HTSUS | 8541.29.0095 |
IGBT Type | Trench Field Stop |
Input Type | Standard |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) |
Mounting Type | Through Hole |
Operating Temperature | -55В°C ~ 175В°C (TJ) |
Package | Tube |
Package / Case | TO-247-3 |
Power - Max | 167W |
REACH Status | REACH Unaffected |
Reverse Recovery Time (trr) | 140ns |
RoHS Status | ROHS3 Compliant |
Series | HB2 -> |
Supplier Device Package | TO-247 Long Leads |
Td (on/off) @ 25В°C | -/71ns |
Test Condition | 400V, 30A, 6.8Ohm, 15V |
Vce(on) (Max) @ Vge, Ic | 2.1V @ 15V, 30A |
Voltage - Collector Emitter Breakdown (Max) | 650V |
Brand | STMicroelectronics |
Collector- Emitter Voltage VCEO Max | 650 V |
Collector-Emitter Saturation Voltage | 1.65 V |
Configuration | Single |
Continuous Collector Current at 25 C | 50 A |
Continuous Collector Current Ic Max | 50 A |
Factory Pack Quantity | 600 |
Gate-Emitter Leakage Current | 250 nA |
Manufacturer | STMicroelectronics |
Maximum Gate Emitter Voltage | -20 V, 20 V |
Maximum Operating Temperature | +175 C |
Minimum Operating Temperature | -55 C |
Mounting Style | Through Hole |
Package/Case | TO-247-3 |
Packaging | Tube |
Pd - Power Dissipation | 167 W |
Product Category | IGBT Transistors |
Product Type | IGBT Transistors |
Subcategory | IGBTs |
Technology | Si |
Channel Type | N |
Maximum Collector Emitter Voltage | 650 V |
Maximum Gate Emitter Voltage | ±30V |
Maximum Power Dissipation | 167 W |
Number of Transistors | 1 |
Package Type | TO-247 long leads |
Pin Count | 3 |
Transistor Configuration | Series |